Building the dry walls.


.... doing the plumbing...


Resting.....

Fitting the partition sheets and think-pink

Crete-stoning the walls... 

Filling in the cracks between the planks with sikoflex.


Sanding the floors. (We hired an industrial sander.)

Sealing the 'red' gum floor of the bedroom.... 

... and the white gum of the lounge and kitchenette.


Ta daa.

The garage floor got screed-ed...

The tools and machines moved in... 

A little parapet built so we don't drive off the edge of the drive way...


The drive-way cleared and our last left over tree trunk  re-positioning  to a place of honor at the front door...



(It was heavy!)  





Wayne built a new temporary stair case... (the old one of bricks got used up in the parapet.)


 I sanded down the new bathroom shelf..

applied sealant...


Ta daa...


The shower floor...


Bathroom...


Kitchen...



And lounge.

Our new flat mate next door in the unfinished roof of the log house.


______________________________________________________




Comments