The floor planks have been sanded and sealed underneath and are stacked downstairs and ready for laying onto the loft floor.
We're left with BAGS of sawdust ...if anyone wants for their garden!
Precious and Timo are routing and cleaning the grooves of the planks for smooth fitting...
Steve and Blessing start laying the planks.
A shot from the future kitchen, below.
Darryl had to shape the planks laying against the wall and around the center logs. The wood is incredibly hard so it took a LOOOONG time!
The floor is almost finished...
...... just the landing has to be done (which was a bit tricky...) but the 3 guys got it sorted.
TaDaaaa...
Steve and I cleaned up the sawdust so that I could apply sealant into the small cracks between each plank.
As you can see, I had help!
....some of the time.
Flash-backs!
From the garage, onto the landing upstairs.
(Then and now.)