The deck

The inside floor is done! It now needs to be sanded...
we'll do that after we've processed the deck planks.

This is the incredible team!

Precious is planing the raw blue gum planks for the deck then edging them with a hand router.
There's a LOT of sawdust!!!
Blessing and I are sealing the never ending deck planks with Timbercare exterior sealant.

Timo and Steve begin to lay the deck.





Finishing off the loft.

Closing up the gaps with uniboard shaped to the logs,  then crete-stoning it.

Darryl is working on the dry walls upstairs!
First he builds the frame...
Covers it with uniboard...
...then John cretestone's the surface.
Sealing the shower /bath area with woodock 25.
The toilet being cretestoned...
Shower area plumbing visible in the drywall.
Placing the bath taps and pipes...


 The study area cretestoned...
 
 Shapeing a log for the shower corner pole.





Sanding the log.


 Wiring the lights.

Wayne and Darryl work on the wiring of the lights downstairs.

Every available surface looks like this!



   