October 2018
The balcony (16 meters by 3 meters) is finally finished. (The endless cutting, planning and shaping was all done by Precious....... and the sealing of planks - by Blessing.) Timo did the fitting and spacing of the planks. He did a final coat of sealant..... ...and Darryl trimmed off the planks at the ends.... and it's all done bar the railing. The shower We put down the Uni-board in the shower/bath area and built a small brick wall. John, the plasterer, put in the shower floor. I put in the finishing touches with some stones we collected from the beach... I we sealed it... Stunning. Darryl and Wayne then built the frame for the shower glass. The toilet Darryl had to chain saw a hole through the log wall to get the toilet and water pipes outside. Cleaning and fixing the second hand toilet we bought .... The basin Darryl welded a frame for the bathroom basin counter. We had bought a second hand piece of ...